PUSRI – IIB PROJECT - REPAIR TANKAGE FA-201

About Project

PUSRI – IIB PROJECT is under maintenance and Repair Tankage FA-201 include Preparation Piping work, Cut , Remove and Rewelding, Remove & re-install pipe support, Remove & re-install steam tracing tubing, Pre-Comissioning Hydro-testing

Tankage FA-201

Repair Tankage FA-201 include Piping work, Cut , Remove and Rewelding

Piping Cut, Remove and Rewelding, include Remove & re-install pipe support.
Dismantle and Re-install tank roof and Hand Rail. Painting of Piping Including Material as per specification and drawing

The Package Include

Preparation
Temporary Facility, Mob-Demob for Equipment, Tools, Scaffolding
Scaffolding Including Scaffolder
Scaffolding installation at ouside of Tank
Scaffolding installation inside the Tank
Lifting including Crane 175ton & Rigger
Piping work
Cut , Remove and Rewelding, Remove & re-install pipe support, Remove & re-install steam tracing tubing.
Dismantle and Re-install Piping Insulation.
Dismantle and Re-install Electrical & Instrument Cable.
Dismantle and Re-install tank roof and Hand Rail.
Painting of Piping Including Material as per specification and drawing
Pre-Comissioning & Hydro-testinng

Related Projects
Jasa Rental Alat dan Manpower Supply durasi minimum 17 hari Hydrotest Pipeline 24" x 2 Segment dan 26" x 2 Segment - Pertamina Geothermal Lumut...
Jasa Pekerjaan Closing Punch List untuk Mendukung kegiatan Plant Stop Revamp 2024 PT Kilang Pertamina Balikpapan. Refinery Unit V Balikpapan, East...
SENG AND SEGAT PROJECTS - GAS COMPRESSOR STATION - Installation Piping Interconnection GTC...
Jasa Rental Alat dan Manpower Supply durasi minimum 14 hari - Hydrotest Pipeline 10, 4, & 6 inchi - Dumai - Pekanbaru -...
Hydrostatic test & N2 Purging Pipeline 11.400 meters dia-16" dan Piping Manifold di Segmen-6 - Langgam -...
Hydrostatic test & N2 Purging Pipeline 11.400 meters dia-16" dan Piping Manifold di Segmen-6 - Langgam -...
id_ID