EPC Piping Pulverizer Bukit Asam Steam Power Plant - COAL FIRED POWER PLANT 2 X 65 MW SEKTOR BUKIT ASAM

Owner       : PLN - PLTU Sektor Bukit Asam
Main-Con : PT. MEGA DSI
Vendor     : PT VERTICAL
Work         : Piping Work
PO. No.     : 80902-MDSI

EPC Project

EPC Piping Pulverizer Bukit Asam Steam Power Plant - COAL FIRED POWER PLANT 2 X 65 MW SEKTOR BUKIT ASAM

Scope Of Work in Projects
ENGINEERING
Design & Detail Drawing
Site Survey, Detail Elevation And Dimensions, Detail Drawing, 3D Drawing & Soft-Drawing, Engineering/ Calculation Material Castings & Document Procedure
Site Survey, Detail Elevation And Dimensions, Detail Drawing, 3D Drawing & Soft-Drawing, Engineering/ Calculation Material Castings & Document Procedure
PROCUREMENT
Pipe Fitting & Matl Casting
Material Pipe, Flanges, Gasket & Bolts, Material Flange, Gasket & Bolts, Material Insulation, Material Lining Ceramic & Coal Pipe Process Casting
Material Pipe, Flanges, Gasket & Bolts, Material Flange, Gasket & Bolts, Material Insulation, Material Lining Ceramic & Coal Pipe Process Casting
Material Pipe, Flanges, Gasket & Bolts, Material Flange, Gasket & Bolts, Material Insulation, Material Lining Ceramic & Coal Pipe Process Casting
Material Pipe, Flanges, Gasket & Bolts, Material Flange, Gasket & Bolts, Material Insulation, Material Lining Ceramic & Coal Pipe Process Casting
Material Pipe, Flanges, Gasket & Bolts, Material Flange, Gasket & Bolts, Material Insulation, Material Lining Ceramic & Coal Pipe Process Casting
CONSTRUCTION
Preparation & Installation
Mobilization & Demobilization, Piping Fit-Up (Pipe & Flange), Piping Shop-Weld (Pipe & Flange), Inspection, Examination And Testing, Coal Pipe Casting, Sandblasting & Painting, Lining/Coating Ceramic, Dismantling & Install, Pre-Commissioning & Start-Up.
Mobilization & Demobilization, Piping Fit-Up (Pipe & Flange), Piping Shop-Weld (Pipe & Flange), Inspection, Examination And Testing, Coal Pipe Casting, Sandblasting & Painting, Lining/Coating Ceramic, Dismantling & Install, Pre-Commissioning & Start-Up.
Mobilization & Demobilization, Piping Fit-Up (Pipe & Flange), Piping Shop-Weld (Pipe & Flange), Inspection, Examination And Testing, Coal Pipe Casting, Sandblasting & Painting, Lining/Coating Ceramic, Dismantling & Install, Pre-Commissioning & Start-Up.
Pre Commissioning

Piping Install & Reinstatement, Equipment, Consumables & Manpower, Cleaning, Flushing, Hydrotesting, Blowing, Drying and Bolt-tightening.

Watch Our Intro!
Related Projects
Jasa Rental Alat dan Manpower Supply durasi minimum 17 hari Hydrotest Pipeline 24" x 2 Segment dan 26" x 2 Segment - Pertamina Geothermal Lumut...
Jasa Pekerjaan Closing Punch List untuk Mendukung kegiatan Plant Stop Revamp 2024 PT Kilang Pertamina Balikpapan. Refinery Unit V Balikpapan, East...
SENG AND SEGAT PROJECTS - GAS COMPRESSOR STATION - Installation Piping Interconnection GTC...
Jasa Rental Alat dan Manpower Supply durasi minimum 14 hari - Hydrotest Pipeline 10, 4, & 6 inchi - Dumai - Pekanbaru -...
Hydrostatic test & N2 Purging Pipeline 11.400 meters dia-16" dan Piping Manifold di Segmen-6 - Langgam -...
Hydrostatic test & N2 Purging Pipeline 11.400 meters dia-16" dan Piping Manifold di Segmen-6 - Langgam -...