Piping Modification Of Gas Pipeline Inlet Line at Grissik Launcher Station
SOUTHERN SUMATERA AREA OPERATION WEST REGION – PT. PERTAMINA GAS

Owner       : PT. PERTAMINA GAS
Main-Con : PT Surya Karya
Sub-Con   : PT VERTICAL
Work         : Pipings Work Services
Vendor     : Piping Fabrication
PO. No.    : QV-.099.1308.19

The Package Include

Engineering
3D-CAD Drawing & As-built Drawing
Preparation
Temporary Facility, Mob-Demob for Pipe Spools, Equipment, & Tools.
Shop Fabrication:
Fit-up & Shop-weld
Sandblasting & Painting
Sandblasting & Painting of Piping
Including Material as per specification and drawings.
Field Weld
Piping Install & Dismantling
Hydrotesting & Reinstatement
Tie-in & Goldent Joint
Bolt-tightening & N2 Purging

Project
Gallery
vertical
Watch Our Intro!
Related Projects
Jasa Rental Alat dan Manpower Supply durasi minimum 17 hari Hydrotest Pipeline 24" x 2 Segment dan 26" x 2 Segment - Pertamina Geothermal Lumut...
Jasa Pekerjaan Closing Punch List untuk Mendukung kegiatan Plant Stop Revamp 2024 PT Kilang Pertamina Balikpapan. Refinery Unit V Balikpapan, East...
SENG AND SEGAT PROJECTS - GAS COMPRESSOR STATION - Installation Piping Interconnection GTC...
Jasa Rental Alat dan Manpower Supply durasi minimum 14 hari - Hydrotest Pipeline 10, 4, & 6 inchi - Dumai - Pekanbaru -...
Hydrostatic test & N2 Purging Pipeline 11.400 meters dia-16" dan Piping Manifold di Segmen-6 - Langgam -...
Hydrostatic test & N2 Purging Pipeline 11.400 meters dia-16" dan Piping Manifold di Segmen-6 - Langgam -...
id_ID