Hydrotest 16″ Segment-4 Pekanbaru
2Hydrostatic test & N2 Purging Pipeline 6.200 meters dia-16" dan Piping Manifold di Segmen-4 - Langgam - Pekanbaru

Owner       : PT EMP
Main-Con : PT INDOLAS
Sub-Con   : PT VERTICAL
Work         : Pre-Commissioning
PO. No.     : QV-IP.216.2308-21-Rev.02 (30/9/21)

EPC Project

EPC Gas Compressor Station & Facility - PERTAMINA EP Field Pendopo - Soth Sumatera.


Introduction

Pertamina EP ASSET 2 is doing a project of "Procurement and Installation of Compressor Facility for Musi Timur Gas - Field Pendopo". Working location of Procurement and Installation of Compressor Facility for Musi Timur Gas - Field Pendopo" is located in the area of the production station of the Pertamina EP Asset 2 Pendopo, Musi Timur - South Sumatra.
Objective The purpose of this Project Quality Plan is to describe the process of managing the Project Quality requirements. This plan povides guidelines for all parties involved in this Project on the Quality performance required. The QA / QC Manager is responsible for the Quality Management of this Project and to ensure all planned quality assurance and co-activities are implemented and completed by the relevant Project team members.

Reference

The following references have been used during the preparation of this document: Contract Document No. EP37-M12LLO122D. Relevant documents that comprise the QMS's owned by the Contractor and its subcontractors.

Objective The purpose of this Project Quality Plan is to describe the process of managing the Project Quality requirements. This plan povides guidelines for all parties involved in this Project on the Quality performance required. The QA / QC Manager is responsible for the Quality Management of this Project and to ensure all planned quality assurance and co-activities are implemented and completed by the relevant Project team members.
Reference The following references have been used during the preparation of this document: Contract Document No. EP37-M12LLO122D. Relevant documents that comprise the QMS's owned by the Contractor and its subcontractors.

Scope Of Work in Projects
Pre Commissioning
Hydrotest Pipelines
Mob-Demob Equipments & Manpower Pipeline Pigging / Cleaning using Gauging plate, Brush pig & Poly pig (Equipment, Consumables & Manpower) Water Filling, Pre-test & Hydrostatic test pipeline diameter 16 inchi (Equipment & Manpower) Flushing, Dewatering Swabbing/ Drying using MB Foam pig & LB Foam pig, Equipment, Consumables & Manpower.
Mob-Demob Equipments & Manpower Pipeline Pigging / Cleaning using Gauging plate, Brush pig & Poly pig (Equipment, Consumables & Manpower) Water Filling, Pre-test & Hydrostatic test pipeline diameter 16 inchi (Equipment & Manpower) Flushing, Dewatering Swabbing/ Drying using MB Foam pig & LB Foam pig, Equipment, Consumables & Manpower.
Mob-Demob Equipments & Manpower Pipeline Pigging / Cleaning using Gauging plate, Brush pig & Poly pig (Equipment, Consumables & Manpower) Water Filling, Pre-test & Hydrostatic test pipeline diameter 16 inchi (Equipment & Manpower) Flushing, Dewatering Swabbing/ Drying using MB Foam pig & LB Foam pig, Equipment, Consumables & Manpower.
Mob-Demob Equipments & Manpower Pipeline Pigging / Cleaning using Gauging plate, Brush pig & Poly pig (Equipment, Consumables & Manpower) Water Filling, Pre-test & Hydrostatic test pipeline diameter 16 inchi (Equipment & Manpower) Flushing, Dewatering Swabbing/ Drying using MB Foam pig & LB Foam pig, Equipment, Consumables & Manpower.
Mob-Demob Equipments & Manpower Pipeline Pigging / Cleaning using Gauging plate, Brush pig & Poly pig (Equipment, Consumables & Manpower) Water Filling, Pre-test & Hydrostatic test pipeline diameter 16 inchi (Equipment & Manpower) Flushing, Dewatering Swabbing/ Drying using MB Foam pig & LB Foam pig, Equipment, Consumables & Manpower.
Pre Commissioning

Mob-Demob Equipments & Manpower
Pipeline Pigging / Cleaning using Gauging plate, Brush pig & Poly pig (Equipment, Consumables & Manpower) Water Filling, Pre-test & Hydrostatic test pipeline diameter 16 inchi (Equipment & Manpower) Flushing, Dewatering Swabbing/ Drying using MB Foam pig & LB Foam pig, Equipment, Consumables & Manpower.

Watch Our Intro!
Related Projects
Jasa Rental Alat dan Manpower Supply durasi minimum 17 hari Hydrotest Pipeline 24" x 2 Segment dan 26" x 2 Segment - Pertamina Geothermal Lumut...
Jasa Pekerjaan Closing Punch List untuk Mendukung kegiatan Plant Stop Revamp 2024 PT Kilang Pertamina Balikpapan. Refinery Unit V Balikpapan, East...
Jasa Rental Alat dan Manpower Supply durasi minimum 14 hari - Hydrotest Pipeline 10, 4, & 6 inchi - Dumai - Pekanbaru -...
Hydrostatic test & N2 Purging Pipeline 11.400 meters dia-16" dan Piping Manifold di Segmen-6 - Langgam -...