Installation Piping Interconnection GTC Package
SENG AND SEGAT PROJECTS - GAS COMPRESSOR STATION - Installation Piping Interconnection GTC Package
Read More
Hydrotest Pipeline 10, 4, & 6 inchi Dumai Pekanbaru
Jasa Rental Alat dan Manpower Supply durasi minimum 14 hari - Hydrotest Pipeline 10, 4, & 6 inchi - Dumai - Pekanbaru - Riau
Read More
Piping Modification Of Gas Pipeline Inlet Line at Grissik Launcher Station
PROCUREMENT, INSTALLATION OF CONTROL VALVE, AND MODIFICATION OF GAS PIPELINE INLET LINE AT GRISSIK LAUNCHER STATION - SOUTHERN SUMATERA AREA OPERATION WEST REGION – PT. PERTAMINA GAS
Read More
Piping Pulverizer Bukit Asam
EPC Project Piping Pulverizer Bukit Asam Steam Power Plant - COAL FIRED POWER PLANT 2 X 65 MW SEKTOR BUKIT ASAM
Read More
PUSRI – IIB PROJECT – REPAIR TANKAGE FA-201
Repair Tankage FA-201 include Preparation Piping work, Cut , Remove and Rewelding, Remove & re-install pipe support, Remove & re-install steam tracing tubing, Pre-Comissioning Hydro-testing
Read More
Hydrotest 20” HDD River Crossing Sungai Supat
EPCC Project Jasa Perancangan, Pengadaan, dan Konstruksi Pembangunan Jaringan Pipa Gas Grissik - Pusri
Read More
Hydrotest 20” HDD Gas Metering Pusri
EPCC Project Jasa Perancangan, Pengadaan, dan Konstruksi Pembangunan Jaringan Pipa Gas Grissik - Pusri
Read More
Hydrotest 20” HDD Gate Pusri
Jasa Perancangan, Pengadaan, dan Konstruksi Pembangunan Jaringan Pipa Gas 20 inchi Grissik – Pusri
Read More
Musi Timur Gas Compressor Station
EPC Gas Compressor Station & Facility - PERTAMINA EP Field Pendopo - Soth Sumatera.
Read More
Arun – Belawan Gas Compressor Station
PT Pertamina Gas (Pertagas) build gas pipeline from Arun, Lhokseumawe to Belawan, Medan. This project include construction of new pipeline from South Lhok- sukon until Pangkalan Batu and Gas Compression Station(s) along the line gas can reach required pressure at Belawan.