Mon-Fri: 8am – 5pm
Installation Piping Interconnection GTC Package
SENG AND SEGAT PROJECTS - GAS COMPRESSOR STATION - Installation Piping Interconnection GTC Package
Read More
Piping Modification Of Gas Pipeline Inlet Line at Grissik Launcher Station
PROCUREMENT, INSTALLATION OF CONTROL VALVE, AND MODIFICATION OF GAS PIPELINE INLET LINE AT GRISSIK LAUNCHER STATION - SOUTHERN SUMATERA AREA OPERATION WEST REGION – PT. PERTAMINA GAS
Read More
Piping Pulverizer Bukit Asam
EPC Project Piping Pulverizer Bukit Asam Steam Power Plant - COAL FIRED POWER PLANT 2 X 65 MW SEKTOR BUKIT ASAM
Read More
PUSRI – IIB PROJECT – REPAIR TANKAGE FA-201
Repair Tankage FA-201 include Preparation Piping work, Cut , Remove and Rewelding, Remove & re-install pipe support, Remove & re-install steam tracing tubing, Pre-Comissioning Hydro-testing
Read More
Arun – Belawan Gas Compressor Station
PT Pertamina Gas (Pertagas) build gas pipeline from Arun, Lhokseumawe to Belawan, Medan. This project include construction of new pipeline from South Lhok- sukon until Pangkalan Batu and Gas Compression Station(s) along the line gas can reach required pressure at Belawan.
Read More
Tanjung Enim Lestari Transmission Gas Pipeline
EPC PROJECT - TRANSMISSION GAS PIPELINE DIA 4” SCH 40 - 10,500 METERS FROM SKG BENUANG TO PT TANJUNG ENIM LESTARI
Read More
id_ID