PUSRI–IIB Project 5.Hydrotesting, Construction, Fabrication, Piping Systems PUSRI – IIB PROJECT - REPAIR TANKAGE FA-201 Owner Main-Con Work WO/ PO. No. Role in Project Industry PT PUPUK SRIWIJAYA Toyo Engineering Corporation Repair Tank & Piping Work AX-4202 (Contract Number BA-1066-AX-37-01 & BA-1066-AX-37-02) Sub Contractor Oil & Gas Scope Of Work Preparation Temporary Facility, Mob-Demob for Equipment, Tools, Scaffolding Scaffolding Including Scaffolder Scaffolding installation at ouside of Tank Scaffolding installation inside the Tank Lifting including Crane 175ton & Rigger Piping workCut , Remove and Rewelding, Remove & re-install pipe support, Remove & re-install steam tracing tubing. Dismantle and Re-install Piping Insulation Dismantle and Re-install Electrical & Instrument Cable Dismantle and Re-install Hand Rai Painting of Piping Including Material as per specification and drawing Pre-Comissioning & Hydro-testinng Scaffolding Work 1. Scaffolding installation at ouside of Tank 2. Scaffolding installation inside the Tank Lifting Work 1. Bring down the damaged Roof & Rafter 2. Lift-up the new Rafter & new Roof 3. Bring down & lift-up the existing handrail from/ to Tank roof 4. Bring down & lift-up the existing platform from/ to Tank roof 5. Bring down & lift-up the existing pipe spool from/ to Tank roof 6. Bring down & lift-up the existing support from/ to Tank roof. Piping Work Cut , Remove and Rewelding, Remove & re-install pipe support, Remove & re-install steam tracing tubing. Pre-Comissioning & Testinng 1. Penetrant and Radiografhy Test 2. Hydrotesting 3. Boltightening