- PLN BUKIT ASAM - COAL FIRED POWER PLANT 2 X 65 MW SEKTOR BUKIT ASAM
-
Work
. - WO/ PO. No.
- Owner
-
: EPC PIPING PULVERIZER STEAM POWER PLANT
-SEKTOR BUKIT ASAM - : 180902-MDSI
- : PLN - PLTU Sektor Bukit Asam
- Project
- Scope Of Work
- ENGINEERING
- PROCUREMENT
- CONSTRUCTION
- Role In Project
- Status
- Client
- SUB-CON
- PT. MEGA DSI
- Industry
- Sector
- MINING
Engineering
1. Site Survey, Detail elevation and dimensions.
2. Detail Drawing, 3D Drawing & Soft-drawing.
3. Engineering/ Calculation Material Castings & Document Procedure
Procurement
1. Material Pipe
2. Material Flange, Gasket & Bolts
3. Material Flange, Gasket & Bolts
4. Material Insulation
5. Material Lining ceramic
5. Coal Pipe Process Casting
Construction
1. Mobilization & Demobilization
2. Piping Fit-Up (Pipe & Flange)
3. Piping Shop-Weld (Pipe & Flange)
4. Inspection, Examination and Testing
5. Coal Pipe Casting
6. Sandblasting & Painting
7. Lining/Coating Ceramic
8, Dismantling & Install
9. Pre-Commissioning & Start-up
Inspection - Examination & Testing
1. Matl Tensile Test & Hardness Test
2. Radiography & Penetrant test
3. Hydro testing & Pneumatic test
Coal Pipe Process Casting & Machinning
1. Core & Pattern Making
2. Sand Mold Making
3. Raw & Metal Melting Pouring
4. Solidification and Cooling
5. Removal of Sand Mold
6. Machining, Cleaning & Inspection
Dismantling - Install & Insulation
1. Truck Mounted Crane (TMC)
2. Install Scaffolding tube component
3. Dismantling Existing Pipe spool & Coal Pipe
4. Install new Pipe spool & Coal Pipe.
5. Coal Pipe & Pipe spool Insulation