- Introduction
- Pertamina EP ASSET 2 is doing a project of "Procurement and Installation of Compressor Facility for Musi Timur Gas - Field Pendopo". Working location of "Procurement and Installation of Compressor Facility for Musi Timur Gas - Field Pendopo" is located in the area of the production station of the Pertamina EP Asset 2 Pendopo, Musi Timur - South Sumatra.
- Objective The purpose of this Project Quality Plan is to describe the process of managing the Project Quality requirements. This plan povides guidelines for all parties involved in this Project on the Quality performance required. The QA / QC Manager is responsible for the Quality Management of this Project and to ensure all planned quality assurance and co-activities are implemented and completed by the relevant Project team members.
-
Reference The following references have been used during the preparation of this document:
Contract Document No. EP37-M12LLO122D.
Relevant documents that comprise the QMS's owned by the Contractor and its subcontractors.
- EPC GAS COMPRESSOR STATION & FACILITY - PERTAMINA EP FIELD PENDOPO South Sumatera.
- Owner
- Main-Con
- Work
- WO/ PO. No.
- Role in Project
- Industry
- PERTAMINA EP FIELD PENDOPO
- PT. INDOTURBINE
- Jasa Pekerjaan Pipings
- 31-12008PO254
- Sub Contractor
- Oil & Gas
- Scope Of Work
-
Engineering
Shop Drawing & As-built Drawing -
Preparation
Welder test, Temporary Facility, Mob-Demob for Equipment, & Tools. -
Piping work
Piping line Process Gass, Piping Line Flare, Piping Line, Fire Water, Piping line Fuel Gas, Piping line Air Instrument, Piping line, Liquid Gas, Line Utility Air, Piping line Anti Surge, Piping Liquid Condesate, Piping line Seal Gas, Piping line Briddle, Piping line Muffler. -
Sandblasting & Painting of Piping
Including Material as per specification and drawings.. -
Pre-Comissioning - Piping Install & Reinstatement:
Equipment, Consumables & Manpower, Cleaning, Flushing, Hydrotest Package; 264 Test Pack, Test Pack Report, Flushing, Blowing & Drying Equipment, Consumables & Manpower, Flushing, Blowing & Drying, Blowing Report, Flange Management, Equipment, Consumables & Manpower, Bolt Tightening report & Flange management tagging.
Construction (Piping Work)
1. Mobilization & Demobilization
2. Piping Fit-up & Shop Weld
3. Piping Install & Field Weld
4. Inspection Radiografhy & Penetrant test
Pre Commissioning & Testing
Equipment, Consumables & Manpower, Cleaning, Flushing, Hydrotest Package; 264 Test Pack, Test Pack Report, Flushing, Blowing & Drying Equipment, Consumables & Manpower, Flushing, Blowing & Drying, Blowing Report, Flange Management, Equipment, Consumables & Manpower, Bolt Tightening report & Flange management tagging.