Hydrotest 16″ Segment-4 Pekanbaru 2.Pipeline Pigging, 3.Cleaning-Flushing, 4.Water Filling, 5.Hydrotesting, 6.Dewatering, 7.N2 Purging, Pre-Commissioning PRODUCTION LINE SENG AND SEGAT PROJECTS Hydrostatic test & N2 Purging Pipeline dia-16" dan Piping Manifold di Segmen-4 - Langgam - Pekanbaru Owner Main-Con Sub-Con Work WO/ PO. No. Role in Project Industry PT. EMP PT. Petroflex PT. Indolas Pratama Hydrotest Pipeline & Piping 16" QV-IP.216.2308-21-Rev.02 (30/9/21) Vendor Hydrotest Oil & Gas Pre-Commissioning Scope of WorK Mob-Demob Equipments & Manpower Pipeline Pigging / Cleaning using Gauging plate, Brush pig & Poly pig (Equipment, Consumables & Manpower) Water Filling, Pre-test & Hydrostatic test pipeline diameter 16 inchi (Equipment & Manpower) Flushing, Dewatering Swabbing/ Drying using MB Foam pig & LB Foam pig, Equipment, Consumables & Manpower. View More : Hydrotest Pipeline 12 inch Segment-5 Pekanbaru Play Video