Grissik Piping Modification

Introduction Untuk Menurunkan Tekanan pada pipeline dari Grissik ke Pusri, PERTAGAS mengadakan modifikasi pada by pass pig louncher untuk di pasang controll valve supaya dapat mengendalikan tekanan pada jalur pipa ke arah pusri. PROCUREMENT & CONSTRUCTION – PIPING MODIFICATION – PERTAMINA GAS South Sumatera. Owner Main-Con Work WO/ PO. No. Role in Project Industry PERTAMINA […]
Read More

PUSRI–IIB Project

PUSRI – IIB PROJECT – REPAIR TANKAGE FA-201 Owner Main-Con Work WO/ PO. No. Role in Project Industry PT PUPUK SRIWIJAYA Toyo Engineering Corporation Repair Tank & Piping Work AX-4202 (Contract Number BA-1066-AX-37-01 & BA-1066-AX-37-02) Sub Contractor Oil & Gas Scope Of Work Preparation Temporary Facility, Mob-Demob for Equipment, Tools, Scaffolding Scaffolding Including Scaffolder Scaffolding […]
Read More

Upgrading Power Plant Merbau

Upgrading Power Plant Project SPG Merbau Pertamina EP Asset 2 Prabumulih Owner Main-Con Work WO/ PO. No. Role in Project Industry PERTAMINA ASET2 PRABUMULIH PT. MUSI INDAH MANDIRI Pekeriaan Civil & Steel Structure M1.180113 Sub Contractor Oil & Gas Scope Of Work Preparation Preparation (Temporary Facility, Mob-Demob for Equipment, & Tools) Pekeriaan Civil & Steel […]
Read More