Musi-Timur Gas Compressor Station

project pt vertical
Introduction Pertamina EP ASSET 2 is doing a project of “Procurement and Installation of Compressor Facility for Musi Timur Gas – Field Pendopo”.  Working location of “Procurement and Installation of Compressor Facility for Musi Timur Gas – Field Pendopo” is located in the area of   the production station of the Pertamina EP Asset 2 […]
Read More

ABP Transmission Gas Pipeline

Operation & Maintenance
INTRODUCTION Proyek Pipanisasi ini untuk Memenuhi kebutuhan Konsumen PT. Aneka Bumi Pratama terhadap PT. Mitra Energi Buana, agar mendapatkan pasokan gas melalui tie-in point jalur pipa gas (di LBCV Musi-2)  ke pabrik Aneka Bumi Pratama Project         : EP & C – PIPELINE & PIPING FABRICATION. Works           : Jasa […]
Read More

CNG Jakabaring Project

Pipeline diameter 6″ & diameter 4″ dari Tapping tie in point ke Gas Metering PT PDPDE. Owner Main-Con Work WO/ PO. No. Role in Project Industry PT. PDPDE GAS PT. VEROJASA TECHNICAL Engineering – Procurement & Construction (Civil, Pipeline, & Piping Fabrication) 146/PDPDEGAS-VERTICAL/K/VII/2012 Main Contractor Oil & Gas Scope Of Work Engineering 2D-Drawing & 3D-Drawing, […]
Read More