Our Vision & Mission

Our Vision & Mission

Mision

  1. We have grown to be a leader in our field because we build and nurture strong client relationships, we rise to any challenge and we value innovation and resourcefulness.
  2. We are committed to delivering a superior quality product in the shortest possible time frame maximising value for our clients.

Vission

To Improve Overall Project Performance Through:
  1. Searching and developing project management talent towards project management excellence.
  2. Providing an entrepreneurial environment where individuals can live their passion for project management.


Civil Work
Steel Structures
Pipelines
Piping systems

With 28 years of experience in pipelines and piping systems and pre commissioing. PT. VERTICAL ensures all critical construction activities meet stringent specifications, Safely within minimal time keeping our clients project On Time and Under Budget.


Pipeline Pigging
Hydrostatic test
Bolt tightening
Nitrogen Purging

Do you want your project to be on schedule? We can pre commissioning a specific pipelines and piping system, either before or after installation, with pipeline pigging and high pressure hydrotesting systems, up to drying with air blowing or pigging and swabbing systems


Operation & Maintenance of gas transmission pipelines and Gas metering Systems.

We have 10+ years experience in Operation of Gas Metering Stations and Maintenance of Gas Pipelines.


Welding Engine
Inverter 250-500Amp
DWT (Dead Weigh Tester)
BARTON Chart Recorder
Fillig Pump & Pressure Pumps
Sandblasting Equipment
Pipeline Pigging Equipment
Scaffolding tube components

Welding, Sandblasting, and Hydrotest Equipment, Rental Quality and Economical.
Welding equipment, hydrotest equipment, tools and accessories are not only an economical but also a resource saving alternative to new machines. Rent a welding machine, and hydrotest equipment for a limited period of time - easy and inexpensive.