RE –ENGINEERING - PIPING CAMBAI 2
Re-Engineering Piping Gas Turbine Compressor Cambai-2

Owner       : PT PERTAGAS
Main-Con : PT INDOTURBINE
Vendor     : PT VERTICAL
Work         : Re-Engineering Piping Gas Turbine Compressor
PO. No.     : 31-12006PO025

PIPING, GAS COMPRESSOR STATION - UPGRADING SECTION 02 - PERTAMINA GAS PRABUMULIH

About Project

Re-Engineering Piping Gas Compressor - Upgrading Gas Compressor Station Section 2

Tankage FA-201

Repair Tankage FA-201 include Piping work, Cut , Remove and Rewelding

3D Drawing All Piping systems
Detailed Elevation and Dimension Survey
Detailed Elevation and Dimension Survey

The Package Include

Detailed Elevation and Dimension Survey
Process Flow Diagram (PFD)
Piping Instrument Diagram (P&ID)
3D Drawing All Piping systems
Design Drawing Piping Layout Plan (include layout future)
Piping Isometric Drawing Include Bill Of Material
As-built Drawing

Related Projects
Jasa Rental Alat dan Manpower Supply durasi minimum 17 hari Hydrotest Pipeline 24" x 2 Segment dan 26" x 2 Segment - Pertamina Geothermal Lumut...
Jasa Pekerjaan Closing Punch List untuk Mendukung kegiatan Plant Stop Revamp 2024 PT Kilang Pertamina Balikpapan. Refinery Unit V Balikpapan, East...
SENG AND SEGAT PROJECTS - GAS COMPRESSOR STATION - Installation Piping Interconnection GTC...
Jasa Rental Alat dan Manpower Supply durasi minimum 14 hari - Hydrotest Pipeline 10, 4, & 6 inchi - Dumai - Pekanbaru -...
Hydrostatic test & N2 Purging Pipeline 11.400 meters dia-16" dan Piping Manifold di Segmen-6 - Langgam -...
Hydrostatic test & N2 Purging Pipeline 11.400 meters dia-16" dan Piping Manifold di Segmen-6 - Langgam -...
en_US