Owner : PT PUPUK SRIWIJAYA
Main-Con : Toyo Engineering
Vendor : PT VERTICAL
Work : Piping Work
PO. No. : BA-1066-AX-37-01 & BA-1066-AX-37-02
PUSRI – IIB PROJECT is under maintenance and Repair Tankage FA-201 include Preparation Piping work, Cut , Remove and Rewelding, Remove & re-install pipe support, Remove & re-install steam tracing tubing, Pre-Comissioning Hydro-testing
Repair Tankage FA-201 include Piping work, Cut , Remove and Rewelding
Preparation
Temporary Facility, Mob-Demob for Equipment, Tools, Scaffolding
Scaffolding Including Scaffolder
Scaffolding installation at ouside of Tank
Scaffolding installation inside the Tank
Lifting including Crane 175ton & Rigger
Piping work
Cut , Remove and Rewelding, Remove & re-install pipe support, Remove & re-install steam tracing tubing.
Dismantle and Re-install Piping Insulation.
Dismantle and Re-install Electrical & Instrument Cable.
Dismantle and Re-install tank roof and Hand Rail.
Painting of Piping Including Material as per specification and drawing
Pre-Comissioning & Hydro-testinng