Hydrotest Pipeline Lumut Balai
Jasa Rental Alat dan Manpower Supply durasi minimum 17 hari Hydrotest Pipeline 24" x 2 Segment dan 26" x 2 Segment - Pertamina Geothermal Lumut Balai
Read More
Pre Commissioning Equipment Rental & Manpower Supply – RDMP Balikpapan
Jasa Pekerjaan Closing Punch List untuk Mendukung kegiatan Plant Stop Revamp 2024 PT Kilang Pertamina Balikpapan. Refinery Unit V Balikpapan, East Kalimantan,Indonesia
Read More
Installation Piping Interconnection GTC Package
SENG AND SEGAT PROJECTS - GAS COMPRESSOR STATION - Installation Piping Interconnection GTC Package
Read More
Hydrotest Pipeline 10, 4, & 6 inchi Dumai Pekanbaru
Jasa Rental Alat dan Manpower Supply durasi minimum 14 hari - Hydrotest Pipeline 10, 4, & 6 inchi - Dumai - Pekanbaru - Riau
Read More
Hydrotest 16″ Segment-4 Pekanbaru
Hydrostatic test & N2 Purging Pipeline 11.400 meters dia-16" dan Piping Manifold di Segmen-6 - Langgam - Pekanbaru
Read More
Hydrotest 16″ Segment-6 Pekanbaru
Hydrostatic test & N2 Purging Pipeline 11.400 meters dia-16" dan Piping Manifold di Segmen-6 - Langgam - Pekanbaru
Read More
Piping Modification Of Gas Pipeline Inlet Line at Grissik Launcher Station
PROCUREMENT, INSTALLATION OF CONTROL VALVE, AND MODIFICATION OF GAS PIPELINE INLET LINE AT GRISSIK LAUNCHER STATION - SOUTHERN SUMATERA AREA OPERATION WEST REGION – PT. PERTAMINA GAS
Read More
Desalter Piping Hydrotest Packages
Timas EPC Proyek Pemasangan Unit Desalter RU III PT. Pertamina RU III Plaju - Palembang - South Sumatera - Desalter Piping Hydrotest Packages 56 Test Pack & 96 Line Quantity Test Pack
Read More
Piping Pulverizer Bukit Asam
EPC Project Piping Pulverizer Bukit Asam Steam Power Plant - COAL FIRED POWER PLANT 2 X 65 MW SEKTOR BUKIT ASAM
Read More
PUSRI – IIB PROJECT – REPAIR TANKAGE FA-201
Repair Tankage FA-201 include Preparation Piping work, Cut , Remove and Rewelding, Remove & re-install pipe support, Remove & re-install steam tracing tubing, Pre-Comissioning Hydro-testing
Read More