Installation Piping Interconnection GTC Package
BCP SENG PROJECT - GAS COMPRESSOR STATION

Owner       : PT EMP
Main-Con : PT Petroflexx
Sub-Con   : PT Gaspro Sentraco
Work         : Piping Work
Vendor     : PT VERTICAL
PO. No.    : 341/PO/XI/23/GSC-102

The Package Include

Preparation
Mobilisasi Manpower & Equipment, Temporary workshop
Piping Shop-Weld
Fit-up & Welding Pipe, Fittings, & Flange
Piping Fiel-Weld
Install spools & valves
Fit-up & Field-weld, Fittings, & Flange
Sandlasting & Painting
Surface preparation SSPC SP-10, Primer Coat, inorganic zinc silicate 76μ, Intermediate Coat, hi-build 127μ, Top Coat, Aliphatic polyurethane 51μ
Pre Commissioning
Hydrotesting, Flushing, & Dewatering (Air Blowing Method) Reistatement (including bolttightening & tagging)

Project
Gallery
vertical
Watch Our Intro!
Related Projects
Jasa Rental Alat dan Manpower Supply durasi minimum 17 hari Hydrotest Pipeline 24" x 2 Segment dan 26" x 2 Segment - Pertamina Geothermal Lumut...
Jasa Pekerjaan Closing Punch List untuk Mendukung kegiatan Plant Stop Revamp 2024 PT Kilang Pertamina Balikpapan. Refinery Unit V Balikpapan, East...
Jasa Rental Alat dan Manpower Supply durasi minimum 14 hari - Hydrotest Pipeline 10, 4, & 6 inchi - Dumai - Pekanbaru -...
Hydrostatic test & N2 Purging Pipeline 11.400 meters dia-16" dan Piping Manifold di Segmen-6 - Langgam -...
Hydrostatic test & N2 Purging Pipeline 11.400 meters dia-16" dan Piping Manifold di Segmen-6 - Langgam -...
PROCUREMENT, INSTALLATION OF CONTROL VALVE, AND MODIFICATION OF GAS PIPELINE INLET LINE AT GRISSIK LAUNCHER STATION - SOUTHERN SUMATERA AREA OPERATION WEST REGION – PT. PERTAMINA...
en_US