Gas Compressor Station
EPC Gas Compressor Station & Facility - Musi Timur - Musi Barat.

Owner       : PERTAMINA EP Field Pendopo
Main-Con : PT INDOTURBINE
Sub-Con   : PT VERTICAL
Work         : Piping Work
PO. No.     : 31-12008PO254

EPC Project

EPC Gas Compressor Station & Facility - PERTAMINA EP Field Pendopo - Soth Sumatera.


Introduction

Pertamina EP ASSET 2 is doing a project of "Procurement and Installation of Compressor Facility for Musi Timur Gas - Field Pendopo". Working location of Procurement and Installation of Compressor Facility for Musi Timur Gas - Field Pendopo" is located in the area of the production station of the Pertamina EP Asset 2 Pendopo, Musi Timur - South Sumatra.
Objective The purpose of this Project Quality Plan is to describe the process of managing the Project Quality requirements. This plan povides guidelines for all parties involved in this Project on the Quality performance required. The QA / QC Manager is responsible for the Quality Management of this Project and to ensure all planned quality assurance and co-activities are implemented and completed by the relevant Project team members.

Reference

The following references have been used during the preparation of this document: Contract Document No. EP37-M12LLO122D. Relevant documents that comprise the QMS's owned by the Contractor and its subcontractors.

Objective The purpose of this Project Quality Plan is to describe the process of managing the Project Quality requirements. This plan povides guidelines for all parties involved in this Project on the Quality performance required. The QA / QC Manager is responsible for the Quality Management of this Project and to ensure all planned quality assurance and co-activities are implemented and completed by the relevant Project team members.
Reference The following references have been used during the preparation of this document: Contract Document No. EP37-M12LLO122D. Relevant documents that comprise the QMS's owned by the Contractor and its subcontractors.

Scope Of Work in Projects
Piping Work
Installation
Piping line Process Gass, Piping Line Flare, Piping Line, Fire Water, Piping line Fuel Gas, Piping line Air Instrument, Piping line, Liquid Gas, Line Utility Air, Piping line Anti Surge, Piping Liquid Condesate, Piping line Seal Gas, Piping line Briddle, Piping line Muffler.
Piping line Process Gass, Piping Line Flare, Piping Line, Fire Water, Piping line Fuel Gas, Piping line Air Instrument, Piping line, Liquid Gas, Line Utility Air, Piping line Anti Surge, Piping Liquid Condesate, Piping line Seal Gas, Piping line Briddle, Piping line Muffler.
Piping line Process Gass, Piping Line Flare, Piping Line, Fire Water, Piping line Fuel Gas, Piping line Air Instrument, Piping line, Liquid Gas, Line Utility Air, Piping line Anti Surge, Piping Liquid Condesate, Piping line Seal Gas, Piping line Briddle, Piping line Muffler.
Fit-Up & Shop-Weld (Pipe, Fittings, & Flange) Piping Install (piping & valves) Piping Field-Weld
Fit-Up & Shop-Weld (Pipe, Fittings, & Flange) Piping Install (piping & valves) Piping Field-Weld
Blasting & Painting Scope Of Work Surface preparation SSPC SP-10, Primer Coat, inorganic zinc silicate 76μ, Intermediate Coat, hi-build 127μ, Top Coat, Aliphatic polyurethane 51μ
Blasting & Painting Scope Of Work Surface preparation SSPC SP-10, Primer Coat, inorganic zinc silicate 76μ, Intermediate Coat, hi-build 127μ, Top Coat, Aliphatic polyurethane 51μ
Pre Commissioning

Piping Install & Reinstatement, Equipment, Consumables & Manpower, Cleaning, Flushing, Hydrotest Package; 264 Test Pack, Test Package Bundling and Report.
Flushing, Blowing & Drying Equipment, Consumables & Manpower, Flushing, Blowing & Drying, Blowing Report, Flange Management, Equipment, Consumables & Manpower, Bolt Tightening report & Flange management tagging.

Watch Our Intro!
Related Projects
Jasa Rental Alat dan Manpower Supply durasi minimum 17 hari Hydrotest Pipeline 24" x 2 Segment dan 26" x 2 Segment - Pertamina Geothermal Lumut...
Jasa Pekerjaan Closing Punch List untuk Mendukung kegiatan Plant Stop Revamp 2024 PT Kilang Pertamina Balikpapan. Refinery Unit V Balikpapan, East...
SENG AND SEGAT PROJECTS - GAS COMPRESSOR STATION - Installation Piping Interconnection GTC...
Jasa Rental Alat dan Manpower Supply durasi minimum 14 hari - Hydrotest Pipeline 10, 4, & 6 inchi - Dumai - Pekanbaru -...
Hydrostatic test & N2 Purging Pipeline 11.400 meters dia-16" dan Piping Manifold di Segmen-6 - Langgam -...
Hydrostatic test & N2 Purging Pipeline 11.400 meters dia-16" dan Piping Manifold di Segmen-6 - Langgam -...