- Transmission Gas Pipeline dia 4" sch 40 1.250 Meter dari PLN Kramasan ke PT. Sunan Rubber
- Owner
- Main-Con
- Work
- WO/ PO. No.
- Role in Project
- Industry
- PT. MITRA ENERGI BUANA
- PT. VEROJASA TECHNICAL
- Engineering - Procurement & Construction (Civil, Pipeline, & Piping Fabrication)
- MEB : 20 / MEB / XI / 2007
- Main Contractor
- Oil & Gas
- Scope Of Work
-
Engineering
2D-Drawing & 3D-Drawing, Isometrict Drawing & Asbuilt-Drawing -
Preparation
Preparation (Welder test, Temporary Facility, Mob-Demob for Equipment, & Tools) Including PJIT -
Civil work
Civil Foundation, Control Room, & Pipe sleeper -
Piping work
Piping line dia-6" & Pipeline dia-2",
Piping Gas Metering & Piping Safety Device -
Painting of Piping
Including Material as per specification and drawing -
Pre-Comissioning & Hydro-testinng
Installation & Reinstatement Hydrostatic test / test package
Civil Work, Piping Work, NDT Test, Pre-Comissioning & Hydro testing
-
Civil work
Civil Foundation for Gas Compressor Engine, Pipe sleeper & Pipe Rack -
Piping work
Piping line Process Gass, Piping Line Flare, Piping Line Fire Water, Piping line Fuel Gas, Piping line Air Instrument, Piping line Liquid Gas, Line Utility Air, Piping line Anti Surge, Piping Liquid Condesate, Piping line Seal Gas, Piping line Briddle, Piping line Muffler. -
Pre-Comissioning & Hydro-testinng
Installation & Reinstatement Hydrostatic test / test package